 Community /Institutional Biogas Programme

GEDA has been implementing Community , Institutional & Night soil based Bio-gas plants (CBP/IBP/NBPs) programme consisting of various capacities / size bio-gas plants based on animal dung , night soil and alternative feed stocks (i.e. canteen waste / Agro food processing industry wastes etc.) Large size plants of various capacities i.e. 15 m3/day to 85m3/day ) plants are being installed to meet the cooking fuel needs of the households in the villages/Temples/ staff of Gaushla & Panjrapoles Institutions. Night soil based plants are also being installed in the educational institutions for meeting partial cooking fuel needs under Central /State level financial assistance Scheme

The State Govt. has approved total 75% subsidy for Community & Institutional Bio-gas Plants (CBP/IBPs ) for the financial year 2002-03.

The scheme implementation strategy adopted so for , was of project implementation on turnkey basis (i.e. supply , installation & commissioning of decided plants capacities including Gas Generation System (GGS) Gas Distribution System (GDS) for supplying bio-gas from plant site to end user point and Bio-gas appliances through registered / qualified professionals adopting tendering procedure.

CLASSIFICATION OF BIOGAS PLANTS BASED ON THE PLANT COMPONENTS

  Bio-gas Plants with Movable Gas holder Fixed Dome
Type
Digester and gas holder Separate Flexible Bag Plant

Sr. No.

Plant Models

i

KVIC Design

Sichuan Model

Sulabh Model

Neuprene Bag Model

ii

IARI Design

Shanghai Model

Bardoli Model

Swasrik Biogas Plant

iii

PRAI design

(Two Chambers)

Janta (Brick Mesonry)

PAU Model

Red Mud Plastic Model

iv

Kamdhanu (baked clay) model

Bhagya Laxmi

Sangli Model

 

v

ASTRA Model

Kalinga (RCC)

CV Krishna Model

(FRP Fixed Dome)

 

vi

JWALA Model

ASTRA (Chinese type)

   

vii

Ganesh Model

GAIC/ATRC (RCC segment) Model

   

viii

Khira model

AFPRO (Horizontal RCC pipe ) model

   

ix

FRP Model

Deen Bandhu Model

   

x

Ferrocement Digester Model

Bharat Model

   

xi

SERC Model

     

xii

SPRERI Model

     


Plant capacity wise total estimated cost , Total Subsidy approved for various capacity bio-gas plants for the year 2002-03 (based on March' 2003 tendered cost)

Plant capacity

Category

Total Cost (in Rs.)

No. of connections

Approx.
Pipe length

Total subsidy (2002-03)

15 M3/day

IBP

250000

8 to 9 nos.

425 mtr

75 %

25 M3/day

CBP

325000

12 to 15 nos.

725 mtr

75 %

 

IBP

350000

     

35 m3/day

CBP

420000

17 to 20 nos.

1025 mtr

75 %

 

IBP

420000

     

45 m3/day

CBP

515000

22 to 25 nos.

1125 mtr

75 %

 

IBP

515000

     

60 m3/day

CBP

635000

30 to 35 nos.

1500 mtr

75 %

 

IBP

635000

     

85 M3/day

CBP

825000

40 to 45 nos.

2025 mtr

75 %

 

IBP

825000

     

As per conditions/ guidelines of MNES administrative sanction for CBP/IBP/NBPs programme , the installation of bio-gas plant of 15, 25, 35, 45, 60 and 85 m3/day are considered and the above capacity is decided based on the Technical feasibility study of the plant site focussing on the bio-gas generation potential and gas utilisation aspects.

 

 

 
 
 
 