500 kW grid
connected gasifier based power palnt at Village Kothara,Taluka Abdasa,
District Kutch. (A Demonstration Project)
Objective :
- Creating a resourceful database for promoting
decentralized power plant based on renewable energy sources.
- Fix the operational parameters for grid
connected gsifier-based power plant.
- Scale-up the unit size of gasifier for
installing power plant above 1 MW
- Employment generation in backward areas of
the country
Biomass resources :
In kuchchh district at village Moti Sindhodi,
Lathedi, Kosha and Vinghabe the Gujarat Energy Development Agency,
Vadodara has raised energy plantation in 1500 hectares of revenue
wastelands, where not even a blade of grass was growing. Against the
odd conditions of saline soil and water the plantation in 1500 hacters
of land, which is now 15 years old, has thrived very well with a
survival percentage of 60 %.
Financial resources :
GEDA planned to set up a 500 kW grid connected
gasifier based power plant in the backward area of Abdasa taluka at
total cost of Rs.180.515 Lac. Out of which Ministry of
Non-Conventional Energy Sources, New Delhi provide the grant of Rs.
120.515 Lac towards the cost of Gasifier, Dg Sets, Control panels,
Transformer, Lab Instruments. GEDA decided to provide fund of Rs. 80
Lac towards the cost of civil work land cost, etc.
Methodology :
Following activities were carried out simultaneously in order to
install the plant.
- Selection of proper site at kuchchh area.
- Selection of turnkey supplier of the plant.
- Selection of Architect
- Selection of civil contractor.
- Permission from GEB
- Certification from Electrical inspector
- License for storage of diesel at site
Technology :
Down draft gasifier technology has been used for the plant. M/S Ankur
Scientific Energy Technologies Private Limited, Vadodara has been
selected as turnkey contractor for the project for the installation,
commissioning and O & M of the plant for two years.
Wood from plantation sites is transported to the plant site after
pruning of the prosopi juliflora. This wood is cut in to a proper size
having Diameter of 3-5 inch. With the help of bucket elevator the cut
wood is fed in to the gasifier at regular interval of 15 minutes. Gas
generated through gasification is cleaned and cooled with the help of
cyclone, water scrubber, and sawdust filter. Cleaned and cool gas is
fed into two DGSets having capacity of 320 kW each. This both the
generators are of dual fuel mode. Producer gas generated through
gasifier has replaced diesel upto 60%.
Commissioning and trial run of the plant :
GEDA commissioned the plant on 3rd July 99 on isolation mode. Trial
run was taken to parallel the plant with GEB grid. In June 2002
electricity generated through this power plant was fed to the GEB
grid.
Till date the plant is running satisfactorily and have supplied net
1,13,500 units to GEB till 27/1/2003.
Efforts are being made to improve the performance further.
|