WASTE TO
ENERGY PROJECTS Implemented Through GEDA in
GUJARAT |
GEDA has implemented two project under MNES
Waste to Energy (WTE) scheme Energy “National policy on Energy
Recovery from Urban , Municipal & industrial Wastes” and one project
has been recently sanctioned to SMC by MNES . The details of
respective projects is here as under :
- 2.0 MW capacity Bio-gas based Power
Generation Project at M/S Kanoria Chemicals Industries Ltd. ,
Ankleshwar.
This project was commissioned during November
(5.11.98 ) 1997-98 financial year under MNES capital investment
subsidy scheme on WTE projects.
The distillery having capacity of 55KLPD is generating about
675 M3/day spent wash per day . this spent wash is being treated
in 2no. Anaerobic Digesters for Bio-methanation. Approximately
21000 to 24000 nm3 /day Bio-gas (containing 60 – 62 % Methane)
is produced daily. The produced gas is further treated for H2S removal
and clean gas is supplied to 2MW Power Plant consisting of 2
no. generators of 1.003 MW each. The Power plant is connected to
existing Electrical Power Supply System.
In order to have maximum benefits the Waste Heat Recovery System (
W.H.R.U.) has also been installed and about 1700 Kg/hr (at 10Kg/Cm2
pressure ) steam generation takes place daily.
Further , The biological sludge /sluury from distillary ETP is piped
to ETP sludge receiving tank and after de watering mixing with press
mud is transformed into Bio-Compost Windrows for 30-45 days to
get Bio-Fertiliser.
The Power plant is working since on average 68.5 to 72.3 PLF
having average monthly generation of 1005000 units.
- Industrial Waste based 4800nm3/day
capacity Bio-methanation Project at M/s Anil Starch Products Ltd.,
Ahmedabad.
An Up Flow Anaerobic Sludge Blanket technology reactor (UASB)
having total bio-gas generation capacity of 4800 nm3/day has
been installed at M/s Anil Starch Products Ltd. Under Waste to
Energy project related interest subsidy scheme of MNES for WTE
projects during financial year 2000-2001.
The project was initially completed & commissioned in April
2001, however gas generation was not up to the amrk because
of various teething problems , it picked up during month of August’
2001 when it reached to its design level .
On average about 4300- 4400 nm3/day bio-gas generation is
taking place which is used in the boilers.
Having this bio-gas unit monthly savings of about Rs. 7.40 lacs (
earlier used to be incurred on coal electricity & lime for starch
waste treatment ) on average is achieved by M/s ASPL .
- Bio-gas based 0. 5 MW capacity Power Plant
at Sewage Treatment Plant – ANJANA site , Surat Municipal
Corporation, Surat.
MNES has sanctioned 0.5 MW capacity bio-gas based power generation
Project under UNDP/GEF assisted Project on “Development of High Rate
Bio-methanation Processes for Reducing Green House Gases Emmission”
. The project has been sanctioned by MNES to SMC at the total outlay
of Rs. 161.955 lacs on 50% cost sharing basis by MNES vide its
sanctioned no. PMC/182-97/ SMC dated 21st July, 2002.
To monitor the implementation of the project a Project
Implementation Committee (PIC) has been constituted comprising of
representatives of SMC, GEDA & MNES . This project is under
progress.
|