COMMUNITY BIOGAS PLANT – METHAN
AT : METHAN
TAL : SIDDHPUR
DISTT : MEHSANA
Methan CBP project which is located at
village Methan in Siddhpur Taluka , Distt: Mehsana of Gujarat (the
largest community size biogas project) was installed and commissioned
on 25 th April , 1987. This project has been dedicated to the
people of Methan in recognition of their spirit of co-operation and
total commitment . The project is being managed very efficiently by
the local body namely “The Silver Jubilee Bio-gas Producers &
Distributors Co- operative Society Ltd., Methan”.
Methan is a small village having a population of about 5000 persons
having about 460 Households. The success story of setting up and
efficient management of the project in this village has evoked
considerable interest in the Global ‘Energy Scenario’ . The world bank
and the B.B.C. have reportedly shown interest in the coverage of this
‘ MODEL’ plant . The daily biogas use for 5-6 hours by the village
households has helped in saving approximately 7800 tonnes firewood,
so far, valued of Rs. 35.50 lacs , which otherwise would have been
chopped & burnt.
Apart from biogas project , in the year 1992-93 under plantation
scheme 50,000 plants were planted with the help of Methan Silver
Jubilee Bio-gas Co-operative Society, on the gram panchayat land so as
to improve the Environment surrounding of the village and later on the
village was adopted as a URJA GRAM.
When the CBP project concept has failed due to various reasons,
this village is the unique example where the community based Bio-gas
project is still functional having back bone of true co-operation
among the people for a noble and common cause.
Salient features of CBP – Methan project are enclosed herewith.
SALIENT FEATURES OF CBP – METHAN
-
CONDUCIVENESS
-
COHESIVENESS
-
CO-OPERATION
-
COMMUNITY FEELING
-
CONCENTRATION ON HUMAN ELEMENT
|
Sr. No.
|
Features |
|
1. |
Total capacity of the
plant |
630 m3 /day |
|
2. |
Total units installed
8 no. |
6* 85 + 2*60 m3/day |
|
3. |
Project commissioned
|
July , 1987
|
|
4. |
Total families covered
initially |
320 family
|
|
5. |
Total cost of the
project ( under 100 % subsidy scheme of DNES in 1994-95) |
Rs. 19.91 lacs
|
|
CURRENT WORKING
STATUS AS ON DEC, 1999.
( after working non stop & completing more than 12 years ) |
|
1. |
Presently total units
working |
5* 85 + 1*60 m 3/ day
|
|
2. |
Total families
presently being benefitted with biogas plants |
176 no. |
|
3. |
Daily dung feeding
|
4 Tractor Trolleys
(8.0 to 8.5 tonnes per day) |
|
4. |
Total gas supply hours
/ day |
5- 6 hours per day |
|
5. |
Slurry / manure
production per year average. |
1920 tonnes per annum |
|
6. |
Average Value of
manure (produced per annum)
@ Rs. 300 / tonnes
approximately |
Rs. 5.70 lacs |
|
7. |
Anual firewood saving
|
72.75 tonnes/ year |
|
8. |
Cost of firewood saved
during last 12 years (@ 300 working days /year) |
Rs.35.50 lacs. approx. |
|
9. |
Operation &
maintenance of the project/ Plant handling Since its commissioning
by
|
"The Silver Jubilee
Biogas Producers & Consumers Co-operative Society- METHAN" |
|