|
Power supply in most of our cities and towns is
unreliable, forcing people to use small generators based on kerosene,
petrol or diesel Such generators cause pollution. noise and lead to
increased dependence on oil imports. It has been established that
small photovoltaic systems generators) in the capacity range of
200-600 watts can be economically viable in comparison to petrol
generators of 500-600 watts capacity.
The solar generators scheme s aimed at encouraging
small shopkeepers. doctors nursing homes and other establishments to
install solar generators Detailed specifications of the solar
generators will be drawn up and manufacturers will be a to submit
their samples for testing by the Solar Energy Centre (SEC) / Other
Authorized Test Centers (OATC5) Solar Generators which are type tested
can be marketed under the scheme through state nodal agencies.
A subsidy of 40% with an upper limit of Rs. 40,000
will be provided on each generator There will be four models of solar
generators, depending upon their PV panel capacity & other related
features as given below :
|
Models of Solar
Generators |
| Model |
PV Capacity |
Estimates Cost |
|
Model - I |
150 Wp |
Rs. 45,000/- |
|
Model - II |
300 Wp |
Rs. 90,000/- |
|
Model - II |
450 Wp |
Rs. 1,35,000/- |
|
Model - IV |
9000 Wp |
Rs. 1,80,000/- |
Users will also be eligible for loans on the
balance cost of the solar generators. under the new interest subsidy
scheme introduced for SPV market development during the current year.
Initially a pilot programme may be taken up in a
cost effective and transparent manner under which each eligible
manufacture will be allowed to implement one pilot project in a
shopping commercial area of any city and offer the benefit of subsidy
and soft loans to the user The subsidy n respect of such pilot
projects wilt be released directly by MNES to the manufactures
ensuring necessary financial safeguards. who will also be required to
provide necessary warranties and after sates service of at least five
years Each pilot project may coger 50-100 generators and will be
sanctioned on the basis of concrete proposals received re
manufacturers. |